finalchapterdaily.name.ng| Verified

Motorists travelling towards London on the A2 faced lengthy delays on Monday, November 23, after an unexpected closure at the Dartford Crossing disrupted traffic across parts of Kent and the surrounding motorway network.

The disruption followed the discovery of damage to an expansion joint near the entrance to the Dartford Crossing’s east bore tunnel during planned overnight maintenance. National Highways confirmed that the defect required emergency repairs, preventing the tunnel from reopening at its scheduled time of 5 a.m.

The closure quickly affected traffic approaching the crossing. By around 7:30 a.m., reports indicated that queues on the A2 near the Darenth Interchange had reached approximately five miles, with motorists facing delays of more than an hour. Congestion extended towards the M2 near Gravesend, adding to difficulties for people travelling through the area.

For some commuters, the disruption turned an ordinary journey into a prolonged wait. One driver quoted in the traffic discussion described spending around two hours travelling from Aylesford to Ebbsfleet. Others reported becoming so frustrated with the queues that they abandoned their journeys.

The tunnel closure was not initially confirmed as the result of a road collision. Instead, the explanation provided by National Highways pointed to an infrastructure defect identified during overnight maintenance.

National Highways said specialist repair crews were expected to attend on Monday morning and that the east bore would remain closed until the necessary work was completed and the tunnel was considered safe to reopen.

The restriction also affected vehicle movements through the crossing. A height limit of 4.8 metres applied, meaning drivers of taller vehicles needed to consider alternative arrangements while the restrictions remained in place.

The consequences were felt beyond the immediate tunnel approach. Traffic reports described disruption on the M25 as well as the A2, illustrating how a closure at the crossing can affect several connected routes. The Dartford Crossing is a major link between Kent and Essex, and restrictions can quickly create pressure on roads feeding into it.

There was no confirmed reopening time in the morning reports. Motorists planning journeys through Gravesend, the A2, M2 or Dartford Crossing were therefore advised to check updated traffic information before setting out and allow additional time.

The incident highlights the wider effect that an unexpected infrastructure problem can have on commuter traffic. Although the original overnight maintenance was expected to finish by 5 a.m., the discovery of damage to the expansion joint meant that further specialist work was needed before the east bore could safely reopen.

For more updates, please check our social media platform

Thank you for reading.

By Admin

Leave a Reply

Your email address will not be published. Required fields are marked *

You missed